Excavator on 600 feet Cooling Tower (remote-controlled)

Because a blast was out of the question, the 162 meters high cooling tower of the former Mülheim-Kärlich nuclear power plant was cleared from above with a remote-controlled excavator piece by piece. After falling below a height of approx. 80 meters, a demolition excavator finally brought the cooling tower down from the ground on August 9, 2019.

Due to a faulty building permit procedure, the nuclear power plant was only in operation for about two years.

(A big Thanks to «Einsatzfahrten Rheinland» (https://www.youtube.com/channel/UCeWTKUhrXbH1PIDSK-Ig8OA) for the recording from August 9, 2019!)

▬ Suggested Videos ▬▬▬▬▬▬▬▬▬▬▬▬

👉 Explosive Demolition of Cooling Tower: https://youtu.be/_ZHBrzYZm1Q
👉 M3 Amphibious Rig driving into River: https://youtu.be/ratKBu2cRp0
👉 Ships travelling on Land: https://youtu.be/PyavKZcN1t0

▬ More Videos ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Subscribe my Channel: https://www.youtube.com/user/HD1080ide?sub_confirmation=1

▬ Social Media ▬▬▬▬▬▬▬▬▬▬▬▬▬▬▬

►Facebook: https://www.facebook.com/HD1080ide
►Twitter: www.twitter.com/HD1080ide